Straight leveling of floor concrete surface [m2] | Gold iron (Incl. Labor costs and Expenses) 金ごて(手間のみ、経費とも) 11千葉市住宅供給公社_限度額表(R02) Stock Status: In Stock Delivery Status: 1-3 days ¥853 Excluding Tax: ¥85 Quantity m2 Add To Cart Description Google this item. Technical Data R02千葉市住宅供給公社_限度額表
Direct leveling finish of concrete floor [m2] | Waterproof base (Incl. Labor costs and Expenses) 11千葉市住宅供給公社_限度額表(R02) 防水下地(手間のみ、経費とも) ¥716
Straight leveling of the concrete surface at the top of Kasagi [m] | Gold iron, thread width 300 (both time and Expenses) 11千葉市住宅供給公社_限度額表(R02) 金ごて 糸幅300(手間のみ、経費とも) ¥807
Floor mortar coating [m2] | Gold iron T28 underlayment (Material only, with Expensess) 11千葉市住宅供給公社_限度額表(R02) 金ごて t28 張物下地(材工、経費とも) ¥3,380
Floor mortar [m2] | Wood soldering iron t38 General tile base (woodwork only, with Expensess) 11千葉市住宅供給公社_限度額表(R02) 木ごて t38 一般タイル下地(材工、経費とも) ¥3,260
Floor mortar [m2] | Gold iron t15 Waterproof base (Material only, with Expensess) 11千葉市住宅供給公社_限度額表(R02) 金ごて t15 防水下地(材工、経費とも) ¥2,560