Plastering Work
Direct leveling finish of concrete floor [m2] | Waterproof base (Incl. Labor costs and Expenses)
11千葉市住宅供給公社_限度額表(R02)
防水下地(手間のみ、経費とも)
¥716
Straight leveling of the concrete surface at the top of Kasagi [m] | Gold iron, thread width 300 (both time and Expenses)
11千葉市住宅供給公社_限度額表(R02)
金ごて 糸幅300(手間のみ、経費とも)
¥807
Straight leveling of floor concrete surface [m2] | Gold iron (Incl. Labor costs and Expenses)
11千葉市住宅供給公社_限度額表(R02)
金ごて(手間のみ、経費とも)
¥853
Floor mortar [m2] | Gold iron t15 Waterproof base (Material only, with Expensess)
11千葉市住宅供給公社_限度額表(R02)
金ごて t15 防水下地(材工、経費とも)
¥2,560
Floor mortar [m2] | Wood soldering iron t38 General tile base (woodwork only, with Expensess)
11千葉市住宅供給公社_限度額表(R02)
木ごて t38 一般タイル下地(材工、経費とも)
¥3,260
Floor mortar coating [m2] | Gold iron T28 underlayment (Material only, with Expensess)
11千葉市住宅供給公社_限度額表(R02)
金ごて t28 張物下地(材工、経費とも)
¥3,380
Gutter mortar coating [m] | gold t30 thread width 200 (material only, with Expensess)
11千葉市住宅供給公社_限度額表(R02)
金ごて t30 糸幅200(材工、経費とも)
¥3,530
Mortar Coating for Drainage [m] | Gold Iron T30 Thread Width 200 (Material only, with Expensess)
11千葉市住宅供給公社_限度額表(R02)
金ごて t30 糸幅200(材工、経費とも)
¥3,970
Wall mortar coating [m2] | Wood soldering iron t11 Interior wall tile base (only woodworker, with Expensess)
11千葉市住宅供給公社_限度額表(R02)
木ごて t11 内壁小口タイル下地(材工、経費とも)
¥4,490
Wall mortar coating [m2] | Wood soldering iron t15 Interior wall unit tile base (Material only, with Expensess)
11千葉市住宅供給公社_限度額表(R02)
木ごて t15 内壁ユニットタイル下地(材工、経費とも)
¥4,660
Wall mortar coating [m2] | Gold soldering iron t20 (only for woodwork, with Expensess)
11千葉市住宅供給公社_限度額表(R02)
金ごて t20(材工、経費とも)
¥4,670