Ordinary plywood formwork [m2] | Foundation (lumber only, with Expensess) 基礎(材工、経費とも) 11千葉市住宅供給公社_限度額表(R02) Stock Status: In Stock Delivery Status: 1-3 days ¥5,940 Excluding Tax: ¥594 Quantity m2 Add To Cart Description Google this item. Technical Data R02千葉市住宅供給公社_限度額表
Simple Formwork [m2] | Stop frame for aisle paving, etc. (Material only, with Expensess) 11千葉市住宅供給公社_限度額表(R02) 通路舗装などの止め枠(材工、経費とも) ¥2,740
Collecting and transporting [times] | 4t, about 25 or more one way (transport only, with Expensess) 11千葉市住宅供給公社_限度額表(R02) 4t 片道概ね25?(運搬のみ、経費とも) ¥38,100
Felling of trees [pcs] | Trunk circumference less than 30cm Cost of disposal (labor and disposal only, with Expensess) 11千葉市住宅供給公社_限度額表(R02) 幹周30cm未満 処分費共(手間・処分のみ、経費とも) ¥1,830
Crushed stone [m3] | Thickness 60-100mm under the foundation (Material only, with Expensess) 11千葉市住宅供給公社_限度額表(R02) 基礎下 厚60~100mm(材工、経費とも) ¥9,140
Crushed stone [m3] | Thickness 60-100mm under the earthen floor (Material only, with Expensess) 11千葉市住宅供給公社_限度額表(R02) 土間下 厚60~100mm(材工、経費とも) ¥8,830