11千葉市住宅供給公社_限度額表(R02)
![Simple Formwork [m2] | Stop frame for aisle paving, etc. (Material only, with Expensess)](http://www.mansikka.info/cache/a1/a15849b86d8bacb9f88a0bd79d1a5ab4500329e6_320x320_fwb.png?_=1663422151)
Simple Formwork [m2] | Stop frame for aisle paving, etc. (Material only, with Expensess)
11千葉市住宅供給公社_限度額表(R02)
通路舗装などの止め枠(材工、経費とも)
¥2,740
![Subflooring [m2] | Lauan plywood (Class 2) 12mm thick (lumber only, with Expensess)](http://www.mansikka.info/cache/a1/a15849b86d8bacb9f88a0bd79d1a5ab4500329e6_320x320_fwb.png?_=1663422151)
Subflooring [m2] | Lauan plywood (Class 2) 12mm thick (lumber only, with Expensess)
11千葉市住宅供給公社_限度額表(R02)
ラワン合板(2類) 厚12mm(材工、経費とも)
¥2,740
![Removal of wall finishing [m2] | Plastering and plastering (Incl. Labor costs and Expenses)](http://www.mansikka.info/cache/a1/a15849b86d8bacb9f88a0bd79d1a5ab4500329e6_320x320_fwb.png?_=1663422151)
Removal of wall finishing [m2] | Plastering and plastering (Incl. Labor costs and Expenses)
11千葉市住宅供給公社_限度額表(R02)
プラスター、漆喰(手間のみ、経費とも)
¥2,740
![Wall, furring frame [m2], wooden furring frame, 35×40mm Type A, alternating 35×40 and 18×40 on wooden shaft (Material only, both](http://www.mansikka.info/cache/a1/a15849b86d8bacb9f88a0bd79d1a5ab4500329e6_320x320_fwb.png?_=1663422151)
Wall, furring frame [m2], wooden furring frame, 35×40mm Type A, alternating 35×40 and 18×40 on wooden shaft (Material only, both
11千葉市住宅供給公社_限度額表(R02)
木製塾組面 胴縁 35×40mm タイプA 木軸に35×40、18×40交互(材工、経費とも)
¥2,750
![Wall Gypsum Board [m2] 12.5 mm thick, non-combustible, with base gypsum board 12.5 mm thick (lumber only, both costs)](http://www.mansikka.info/cache/a1/a15849b86d8bacb9f88a0bd79d1a5ab4500329e6_320x320_fwb.png?_=1663422151)
Wall Gypsum Board [m2] 12.5 mm thick, non-combustible, with base gypsum board 12.5 mm thick (lumber only, both costs)
11千葉市住宅供給公社_限度額表(R02)
厚12.5mm 不燃 突き付け 下地せっこうボード厚12.5mm共(材工、経費とも)
¥2,780

Rawan plywood (Class 1), thickness 9.0 mm (lumber only, with Expensess)
11千葉市住宅供給公社_限度額表(R02)
ラワン合板(1類) 厚9.0mm(材工、経費とも)
¥2,800
![Removal of sub-flooring [m2] | Flooring, including bundling, and bundling stones (Incl. Labor costs and Expenses)](http://www.mansikka.info/cache/a1/a15849b86d8bacb9f88a0bd79d1a5ab4500329e6_320x320_fwb.png?_=1663422151)
Removal of sub-flooring [m2] | Flooring, including bundling, and bundling stones (Incl. Labor costs and Expenses)
11千葉市住宅供給公社_限度額表(R02)
床組 束立 束石含む(手間のみ、経費とも)
¥2,810
![Subflooring [m2] | Lauan plywood (Class 1), 12mm thick (lumber only, with Expensess)](http://www.mansikka.info/cache/a1/a15849b86d8bacb9f88a0bd79d1a5ab4500329e6_320x320_fwb.png?_=1663422151)
Subflooring [m2] | Lauan plywood (Class 1), 12mm thick (lumber only, with Expensess)
11千葉市住宅供給公社_限度額表(R02)
ラワン合板(1類) 厚12mm(材工、経費とも)
¥2,840
![Mixing faucet installation [each] | only a hassle, no cost](http://www.mansikka.info/cache/a1/a15849b86d8bacb9f88a0bd79d1a5ab4500329e6_320x320_fwb.png?_=1663422151)
Mixing faucet installation [each] | only a hassle, no cost
11千葉市住宅供給公社_限度額表(R02)
手間のみ、経費とも
¥2,920
![Mixing faucet installation [pcs] | only labor, both costs_1](http://www.mansikka.info/cache/a1/a15849b86d8bacb9f88a0bd79d1a5ab4500329e6_320x320_fwb.png?_=1663422151)
Mixing faucet installation [pcs] | only labor, both costs_1
11千葉市住宅供給公社_限度額表(R02)
手間のみ、経費とも
¥2,920
![Wall Calcium Silicate Board [m2] | Thickness 8.0mm, non-combustible, sticking (Type? - Non-asbestos, 0.8FK)(Material only, cost](http://www.mansikka.info/cache/a1/a15849b86d8bacb9f88a0bd79d1a5ab4500329e6_320x320_fwb.png?_=1663422151)
Wall Calcium Silicate Board [m2] | Thickness 8.0mm, non-combustible, sticking (Type? - Non-asbestos, 0.8FK)(Material only, cost
11千葉市住宅供給公社_限度額表(R02)
厚8.0mm 不燃 突き付け (タイプ?・無石綿・0.8FK)(材工、経費とも)
¥2,950
![Loading (machine) [m3] | Interior finishing materials and wood (machine)(labor only, both costs)](http://www.mansikka.info/cache/a1/a15849b86d8bacb9f88a0bd79d1a5ab4500329e6_320x320_fwb.png?_=1663422151)
Loading (machine) [m3] | Interior finishing materials and wood (machine)(labor only, both costs)
11千葉市住宅供給公社_限度額表(R02)
内装仕上げ材・木材類 (機械)(手間のみ、経費とも)
¥3,040
![Removal of wooden fittings [location] | Double flush door frame, width 1800×1800~2000 (Incl. Labor costs and Expenses)](http://www.mansikka.info/cache/a1/a15849b86d8bacb9f88a0bd79d1a5ab4500329e6_320x320_fwb.png?_=1663422151)
Removal of wooden fittings [location] | Double flush door frame, width 1800×1800~2000 (Incl. Labor costs and Expenses)
11千葉市住宅供給公社_限度額表(R02)
両開きフラッシュ戸 枠共 幅1800×1800~2000(手間のみ、経費とも)
¥3,040
![Floor finishing material removal [m2] | Stone 20-25mm thick (Incl. Labor costs and Expenses)](http://www.mansikka.info/cache/a1/a15849b86d8bacb9f88a0bd79d1a5ab4500329e6_320x320_fwb.png?_=1663422151)
Floor finishing material removal [m2] | Stone 20-25mm thick (Incl. Labor costs and Expenses)
11千葉市住宅供給公社_限度額表(R02)
石材 厚20~25mm(手間のみ、経費とも)
¥3,040
![Removal of wall finishing [m2] | Mortar (Incl. Labor costs and Expenses)](http://www.mansikka.info/cache/a1/a15849b86d8bacb9f88a0bd79d1a5ab4500329e6_320x320_fwb.png?_=1663422151)
Removal of wall finishing [m2] | Mortar (Incl. Labor costs and Expenses)
11千葉市住宅供給公社_限度額表(R02)
モルタル(手間のみ、経費とも)
¥3,040
![Wall Calcium Silicate Board [m2], Thickness 8.0mm, Nonflammable, Watermark (Type? - Asbestos, 0.8FK) Asbestos-free, 0.8FK)(Mater](http://www.mansikka.info/cache/a1/a15849b86d8bacb9f88a0bd79d1a5ab4500329e6_320x320_fwb.png?_=1663422151)
Wall Calcium Silicate Board [m2], Thickness 8.0mm, Nonflammable, Watermark (Type? - Asbestos, 0.8FK) Asbestos-free, 0.8FK)(Mater
11千葉市住宅供給公社_限度額表(R02)
厚8.0mm 不燃 目透かし (タイプ?・無石綿・0.8FK)(材工、経費とも)
¥3,060
![Vinyl floor sheeting (plain) [m2] | 2.5mm thick, woven fabric laminated NC (Material only, with Expensess)](http://www.mansikka.info/cache/a1/a15849b86d8bacb9f88a0bd79d1a5ab4500329e6_320x320_fwb.png?_=1663422151)
Vinyl floor sheeting (plain) [m2] | 2.5mm thick, woven fabric laminated NC (Material only, with Expensess)
11千葉市住宅供給公社_限度額表(R02)
厚2.5mm 織布積層 NC(材工、経費とも)
¥3,180
![Installing a paper winder [set] | both in terms of time and money](http://www.mansikka.info/cache/a1/a15849b86d8bacb9f88a0bd79d1a5ab4500329e6_320x320_fwb.png?_=1663422151)
Installing a paper winder [set] | both in terms of time and money
11千葉市住宅供給公社_限度額表(R02)
手間のみ、経費とも
¥3,180
![Floor mortar [m2] | Wood soldering iron t38 General tile base (woodwork only, with Expensess)](http://www.mansikka.info/cache/a1/a15849b86d8bacb9f88a0bd79d1a5ab4500329e6_320x320_fwb.png?_=1663422151)
Floor mortar [m2] | Wood soldering iron t38 General tile base (woodwork only, with Expensess)
11千葉市住宅供給公社_限度額表(R02)
木ごて t38 一般タイル下地(材工、経費とも)
¥3,260
![Picture frame [m] | Spruce, 40×30(woodwork only, with Expensess)](http://www.mansikka.info/cache/a1/a15849b86d8bacb9f88a0bd79d1a5ab4500329e6_320x320_fwb.png?_=1663422151)
Picture frame [m] | Spruce, 40×30(woodwork only, with Expensess)
11千葉市住宅供給公社_限度額表(R02)
スプルース 40×30(材工、経費とも)
¥3,300