Concrete Work
![Concrete block stacking [m2] | 100×190×390(Material only, with Expensess)](http://www.mansikka.info/cache/a1/a15849b86d8bacb9f88a0bd79d1a5ab4500329e6_320x320_fwb.png?_=1663422151)
Concrete block stacking [m2] | 100×190×390(Material only, with Expensess)
11千葉市住宅供給公社_限度額表(R02)
100×190×390(材工、経費とも)
¥10,200
![Concrete block stacking [m2] | 120×190×390(Material only, with Expensess)](http://www.mansikka.info/cache/a1/a15849b86d8bacb9f88a0bd79d1a5ab4500329e6_320x320_fwb.png?_=1663422151)
Concrete block stacking [m2] | 120×190×390(Material only, with Expensess)
11千葉市住宅供給公社_限度額表(R02)
120×190×390(材工、経費とも)
¥11,500
![Discarded concrete [m3] | Human labor (Incl. Labor costs and Expenses)](http://www.mansikka.info/cache/a1/a15849b86d8bacb9f88a0bd79d1a5ab4500329e6_320x320_fwb.png?_=1663422151)
Discarded concrete [m3] | Human labor (Incl. Labor costs and Expenses)
11千葉市住宅供給公社_限度額表(R02)
人力(手間のみ、経費とも)
¥16,000
![Concrete for earthen floor [m3] | Human labor (Incl. Labor costs and Expenses)](http://www.mansikka.info/cache/a1/a15849b86d8bacb9f88a0bd79d1a5ab4500329e6_320x320_fwb.png?_=1663422151)
Concrete for earthen floor [m3] | Human labor (Incl. Labor costs and Expenses)
11千葉市住宅供給公社_限度額表(R02)
人力(手間のみ、経費とも)
¥16,000
![Ready-mixed concrete [m3] | 43332(material only, with Expensess)](http://www.mansikka.info/cache/a1/a15849b86d8bacb9f88a0bd79d1a5ab4500329e6_320x320_fwb.png?_=1663422151)
Ready-mixed concrete [m3] | 43332(material only, with Expensess)
11千葉市住宅供給公社_限度額表(R02)
43332(材のみ、経費とも)
¥16,000
![Ready-mixed concrete [m3] | 18-15-20(lumber only, both costs)](http://www.mansikka.info/cache/a1/a15849b86d8bacb9f88a0bd79d1a5ab4500329e6_320x320_fwb.png?_=1663422151)
Ready-mixed concrete [m3] | 18-15-20(lumber only, both costs)
11千葉市住宅供給公社_限度額表(R02)
18-15-20(材のみ、経費とも)
¥16,000
![Ready-mixed concrete [m3] | 21-18-20(lumber only, both costs)](http://www.mansikka.info/cache/a1/a15849b86d8bacb9f88a0bd79d1a5ab4500329e6_320x320_fwb.png?_=1663422151)
Ready-mixed concrete [m3] | 21-18-20(lumber only, both costs)
11千葉市住宅供給公社_限度額表(R02)
21-18-20(材のみ、経費とも)
¥16,300
![Small structure [m3] | Human power (Incl. Labor costs and Expenses)](http://www.mansikka.info/cache/a1/a15849b86d8bacb9f88a0bd79d1a5ab4500329e6_320x320_fwb.png?_=1663422151)
Small structure [m3] | Human power (Incl. Labor costs and Expenses)
11千葉市住宅供給公社_限度額表(R02)
人力(手間のみ、経費とも)
¥22,700
![Pump feeding [times] only](http://www.mansikka.info/cache/a1/a15849b86d8bacb9f88a0bd79d1a5ab4500329e6_320x320_fwb.png?_=1663422151)
Pump feeding [times] only
11千葉市住宅供給公社_限度額表(R02)
のみ
¥121,000