Small structure [m3] | Human power (Incl. Labor costs and Expenses) 人力(手間のみ、経費とも) 11千葉市住宅供給公社_限度額表(R02) Stock Status: In Stock Delivery Status: 1-3 days ¥22,700 Excluding Tax: ¥2,270 Quantity m3 Add To Cart Description Google this item. Technical Data R02千葉市住宅供給公社_限度額表
Discarded concrete [m3] | Human labor (Incl. Labor costs and Expenses) 11千葉市住宅供給公社_限度額表(R02) 人力(手間のみ、経費とも) ¥16,000
Concrete for earthen floor [m3] | Human labor (Incl. Labor costs and Expenses) 11千葉市住宅供給公社_限度額表(R02) 人力(手間のみ、経費とも) ¥16,000
Ready-mixed concrete [m3] | 43332(material only, with Expensess) 11千葉市住宅供給公社_限度額表(R02) 43332(材のみ、経費とも) ¥16,000
Ready-mixed concrete [m3] | 18-15-20(lumber only, both costs) 11千葉市住宅供給公社_限度額表(R02) 18-15-20(材のみ、経費とも) ¥16,000